Wołomin IOS

Cyclone filter behind the boiler WR10, installed in 2015 for the Thermal Power Plant in Wołomin, emission reduction below 100mg. Installation of an exhaust duct connecting it with a collector.

Cyclone filter behind the boiler WR10, installed in 2015 for the Thermal Power Plant in Wołomin, emission reduction below 100mg. Installation of an exhaust duct connecting it with a collector.

+9

Norway IOS

Air filters for the flue gas dedusting system, installed in 2016 for Alfsen og Gunderson AS in Norway.

Air filters for the flue gas dedusting system, installed in 2016 for Alfsen og Gunderson AS in Norway.

Gomar Pińczów

Bag filter for two boilers OR10 and one boiler OKR5, installed in 2016 for Gomar Pińczów Sp. z o.o.

Bag filter for two boilers OR10 and one boiler OKR5, installed in 2016 for Gomar Pińczów Sp. z o.o.

Krasnystaw

Delivery and installation of dedusting system in Krasnystaw for the WR-5 boiler and the WR-8 boiler in the form of FBC devices (guaranteed emission below 100mg).

Delivery and installation of dedusting system in Krasnystaw for the WR-5 boiler and the WR-8 boiler in the form of FBC devices (guaranteed emission below 100mg).

+25

Grand Tower Frankfurt

Realization: 2016-2017, Project: Grand Tower Frankfurt, Customer: Hunnebeck Deutschland GmbH The range of deliveries and installation: self-climbing formwork (SCF), constructions of SafeScreen panels, boards and shuttering systems.

Realization: 2016-2017,
Project: Grand Tower Frankfurt,
Customer: Hunnebeck Deutschland GmbH
The range of deliveries and installation:

  • self-climbing formwork (SCF),
  • constructions of SafeScreen panels,
  • boards and shuttering systems.

+2

Tczew OZGW

Completion, delivery and installation of 5 pieces of scraper conveyors with upper material discharge system of OZGW-57 with electrical installation for GPEC Tczew, for the WR-25 boiler and WR-10 boiler, the investment prepared in 2016 year.

Completion, delivery and installation of 5 pieces of scraper conveyors with upper material discharge system of OZGW-57 with electrical installation for GPEC Tczew, for the WR-25 boiler and WR-10 boiler, the investment prepared in 2016 year.

Pińczów IOS

Completion and installation of dedusting system for two boilers: OR-10 and one boiler: OKR-5, based on bag filters allowing for limitation dusts emission in exhaust fumes under 100mg. The investment prepared in 2016 year.

Completion and installation of dedusting system for two boilers: OR-10 and one boiler: OKR-5, based on bag filters allowing for limitation dusts emission in exhaust fumes under 100mg. The investment prepared in 2016 year.

Mielec IOS

Completion and installation of dedusting system for three steam boilers: OR-64 and two water boilers: WR-25, pressure elements of the boiler: WR-5 in heat and power station in Mielec.

Completion and installation of dedusting system for three steam boilers: OR-64 and two water boilers: WR-25, pressure elements of the boiler: WR-5 in heat and power station in Mielec.

+4

Kaloria Opoczno IOS

Dobre Miasto IOS

Aleksandrów Łódzki IOS

+29

Others